Sunday, October 27, 2013
Friday, October 4, 2013
Progression
| Footers poured, it was very dark and late when I took the pic. |
![]() |
| Gravel base in place. |
![]() |
| Over 3 inches of rain and we now have a swimming pool instead of a basement :( |
![]() |
| Part of the sides collapsed in several areas. |
| Water finally dried up via the electric pump in the background. |
| Some of the damage :( |
| Walls poured and forms removed. |
| My future garage. |
| Additional view |
| Sump pump in place |
| My daughter said this stake looked like a ninja, my son said it was TMNT Michelangelo. |
![]() |
| Plumbing started |
![]() |
| Garage floor base pile and additional layer of gravel on construction entrance. |
![]() |
| Sump with additional plumbing and waterproofing barrier. |
![]() |
| Waterproof barrier wrap in place. |
![]() |
| The kid's bathtub has arrived. |
![]() |
| Current view from the street. |
![]() |
| Not sure what the pipe next the basement egress window is for? |
![]() |
| A little more grading in the back yard. |
![]() |
| Back fill done. |
Monday, September 16, 2013
Ground Breaking!!!
They finally have a hole on my lot. After a few classes today I went by the lot to see that they were in the process of digging on our lot. I had my daughter with me and she just kept smiling and clapping her hands. She said she just couldn't wait to tell mommy :). We are going to go over as a family this evening. Finally feeling excited again which is why I finally made some updates to this blog!
NVR and Ryan Homes Issues!!
We had nearly 6 weeks worth of delays on ground breaking due to wasting time with NVR mortgage! I was beginning to get very frustrated with this whole process. We have switched to another lender as NVR could not get the loan done due to a technicality. The new lender had a better interest rate and lower fees for the same type of loan so it is for the best anyway. It is just irritating that NVR caused such an issue and blatantly lied to us which just led to wasting our time. Overall NVR had our documents over 7 weeks and accomplished nothing. Having a mortgage finance background myself, I asked if there would be an issues in the day we signed the initial loan documents and was told no. In the end it was an issues and the loan officer should have known this and not wasted 7 weeks of our time. Also when they determined that they would not do the loan they did not even tell us for 5 full days. When they did tell us it was at 6 pm on a Friday so we could not even start the process with another company until Monday, just more delay and irritation. Once we got the new lender on board they had the loan approved in a mere 18 days. Really, in 18 days they did better than what NVR did after wasting nearly 7 weeks of our time! Also NVR was supposed to send our documents over to the new lender and even had me send a notification that they could do this, but never sent anything the new lender needed so we ended up sending all the docs over again and they still were done in 18 days.
In addition to all of the mortgage drama we began to have difficulty getting anyone to answer or respond to us. NVR was nearly impossible to get in touch with. Our SR rarely answered the phone, didn't respond to emails for several days and sometimes nearly a week, and frequently didn't return calls. We had to do an additional change order and it took her over a week to get it to us just to sign and send back. In the midst of all of this she transferred to another community making it that much more difficult to get things done. Once our loan was approved our PM says he was not even notified of it, even though we were told several times by our SR that he had been told, until 2 weeks later. I believe our PM, hopefully now that things are in his hands our experience with them will improve. I was trying to get an accurate ground breaking date from our SR and felt like I was getting excuses of permits, etc. Needless to say I am not overly happy with NVR or Ryan Homes at this point. We will push forward for now though as we want the house but it still has me irritated and not willing to put up with much more from them.
In addition to all of the mortgage drama we began to have difficulty getting anyone to answer or respond to us. NVR was nearly impossible to get in touch with. Our SR rarely answered the phone, didn't respond to emails for several days and sometimes nearly a week, and frequently didn't return calls. We had to do an additional change order and it took her over a week to get it to us just to sign and send back. In the midst of all of this she transferred to another community making it that much more difficult to get things done. Once our loan was approved our PM says he was not even notified of it, even though we were told several times by our SR that he had been told, until 2 weeks later. I believe our PM, hopefully now that things are in his hands our experience with them will improve. I was trying to get an accurate ground breaking date from our SR and felt like I was getting excuses of permits, etc. Needless to say I am not overly happy with NVR or Ryan Homes at this point. We will push forward for now though as we want the house but it still has me irritated and not willing to put up with much more from them.
Wednesday, July 31, 2013
Final Flooring Selections
Well after several issues with flooring selection we have now made our final choices. We had selected the previously shown Engineered Hardwood that we are absolutely in love with. However we have been told that in this area the builders will not do an Engineered Hardwood except on a slab foundation. This still makes very little sense to me as I know that this can be done and many other areas are able to do this. We Like the floor that we have ended up with but we Loved the floor we originally selected. It had lots of texture and color variation to it that gave it a very unique character that none of the other selections had. We are trying to stick to somewhat of a craftsman theme for the house and both feel that the first selection was also much more fitting. So far this has been my only issue with Ryan Homes but it is one that was very irritating. Anyway as follows is our final flooring selections.
- Simple Touch Sand Swept Carpet - Whole House - $3,565
- Upgraded Padding to 8 lb. Admiral - Basement and Main Floor - $675
- Rustic Heritage 5" Wide Birch in Tobacco Brown - Foyer, Kitchen, and Dinette - $4,190
- Station Square X2122 - Upstairs Hall Bath - $50
- Station Square X2080 - Basement Powder Room - $50
- Station Square X2083 - Main Floor Powder Room, Laundry, Master Bath - $200
We also added a switched receptacle in the upper cabinets in the kitchen ($110) for future under cabinet lighting.
| Rustic Heritage 5" Hand Scrapped Birch in Tobacco Brown |
| The end result of the hardwood will be something like this. |
| Station Square X2122 - Upstairs Hall Bath |
| Station Square X2083 - Main Floor Powder Room, Laundry Room, and Master Bathroom |
| Station Square X2080 - Basement Powder Room |
| Simple Touch Sand Swept Carpet - Whole House |
Saturday, July 20, 2013
Timeline update!!
Ok, third post today. I told you I was behind, this is actually from today though. We went to the model to make a few changes and sign off on some things. Our SR looked at our timeline and noted that an estimated ground breaking day is Aug 7. This is both very exciting as I can't wait to have our new home, and stressful at the same time. This would have us in the house in Oct instead of the previously projected Nov. This is good news!!! The stress comes from having to get a bunch of other loose ends tied up before then. I can't wait for groundbreaking though. I am so excited for the build to start and go by and see the progress each day. My kids are also excited and I think the process will be a great learning experience for them also. There is another Florence (elevation D) going up on the lot next to us. We have been by it a few times and the kid's, especially our daughter, thinks that it is ours. This has given us several chuckles already during this process and I am sure more are to come.
More Changes and Some of Our Own Additions
- Changed all bathroom fixtures, faucets, towel bars, TP holders, and shower door to oil rubbed bronze ($1,195)
- Added 2 pendant lights over island ($395)
- Added outlet on stone fireplace for mounted TV hookup ($195)
- Delete master bathroom tile (-$995)
- Other flooring changes (???? - still waiting :{ we are wanting to change from the laminate flooring to a hardwood flooring in the Entry, Dinette, and Kitchen, also we selected a carpet that was a little lighter in color)
| Master Bathroom and Basement 1/2 Bath |
| Entry Foyer, Dinette, and Kitchen Engineered 5" Handscraped Hickory Plank Hardwood |
| The look in a room |
| The changed carpet color for the whole house |
We have been looking at several different options for fixtures throughout the home. This is some of the items that we are currently talking about purchasing for our home.
| Family Room Ceiling Fan I think this will be very fitting with the exterior styling and the stone fireplace. |
| Delta Addison with Pull-Down Sprayer and Touch Technology $355 at HD |
Guardian Meeting
I am a little late in getting this post up but here it is. I must start by saying that I was not really looking forward to this meeting. I read a lot of negative reviews about Guardian as a whole. My experience was a good one though. Our SR was honest and personable and did not use any high pressure sales tactics that I had read was often the case. He asked what service providers we used and what rooms we would want equipment in, then showed us what we would need to make it work. Here is what we ended up with.
- Pre-wire for wall mounted TV over the fireplace
- Pre-wire for rear surround sound speakers in the basement (this will be used for the surround sound system that I currently have)
- 5.1 Surround Sound system (ceiling mounted) in the family room
- 3 high speed internet hookups in the loft, family room, and basement (upgraded to Cat6e)
- 5 Pack of extra lines + 1 free line
- Total cost for everything $2,305
The other things that were offered just did not have the value for me. The central vac to me is just not worth the cost. The intercom, my voice can carry to the neighbors house so this is definitely not needed. As for the security system I see the value in it, I just have a hard time justifying the cost for a what-if scenario. That is just me, always stressing about costs.
Thanks to our SR for making what I felt was going to be a bad experience, into a pleasant one.
Subscribe to:
Posts (Atom)





















